Commercial- Walker Signs EV
Client: Westmoorland Family
Industry: Commercial
The Aim
To provide Tebay and Cairn Services with high‑capacity, future‑proof EV charging facilities capable of dramatically reducing charging times for drivers, meeting growing demand, and positioning the sites as leaders in sustainable transport.
The Solution
• Initial Design – Conducted load assessments, cable sizing, and infrastructure planning to support 300 kW units.
• Installation Works – Installed high‑capacity cabling, switchgear, and protective systems while keeping the service areas operational.
• Commissioning – Performed full testing, calibration, and integration to ensure optimal performance and compliance with all regulations.
• Future‑Proofing – Designed the system to allow for easy expansion or upgrades without major infrastructure changes.
The Outcome
• Record‑Breaking Capacity – First 300 kW chargers in the UK, enabling ultra‑fast charging for compatible EVs.
• Enhanced Customer Experience – Significantly reduced charging times, increasing throughput and convenience.
• Sustainability Leadership – Positioned the client as a pioneer in EV infrastructure, supporting the UK’s transition to low‑carbon transport.